Ground improvement by jet grouting and injection to control hydraulic conditions in the frame of Grand Paris Express Project, North-East section: methodology and quality control sequence
Cơ quan:
Eiffage Infrastructure, Vélizy Villacoublay, France
- *Tác giả liên hệ:This email address is being protected from spambots. You need JavaScript enabled to view it.
- Từ khóa: Groundwater conditions, Injection, Jet grouting, Quality control, TBM’s departure and arrival gates.
- Nhận bài: 08-09-2021
- Sửa xong: 15-12-2021
- Chấp nhận: 31-01-2022
- Ngày đăng: 31-07-2022
- Lĩnh vực: Kỹ thuật Xây dựng
Tóm tắt:
The main tunnels of Line 16 Lot1 of the Grand Paris Express project are underway since 2019 using tunnel boring machines (TBM). They are drilled entirely in permeable strata (fine/silty sands, marls, and limestones) at a depth of 20÷30 m below the groundwater level. Groundwater inflow with high pressure is a major issue at the arrival/departure sections of the TBMs as well as during the excavation work of connection galleries between the main tunnels and maintenance or security shafts. Line 16 Lot1 is located under dense urban areas with the requirement of minimizing the drawdown of the groundwater and water inflow in civil engineering works; the purpose is to avoid excessive settlements on existing facilities and dissolution reactivation process of gypsum-rich strata. In order to minimize these risks, different types of ground improvement technics (jet grouting and cement mixture injection) have been applied, where jet grouting is used in fine sandy soil and cement mixture injection used in fissured marly-limestone. In addition, both technics of improvement have been associated on the same site. From a geotechnical point of view, the sands of Beauchamp are classified as coarse-grained soils (60% SM and 40% ML in the Unified soil Classification System ) and Marly-limestone of Saint-Ouen and deep Marls as fissured soft to medium-hard calcareous rock. This paper presents the geotechnical conditions, the ground improvement methodology and quality control during construction. The control sequence is performed by vertical and then horizontal drilling holes. The method of control work after excavation (horizontal control) allows to confirm the quality of the treatment blocks and specifically the bonding between the treatment block and the diaphragm wall.
Harada, K., Ohbayashi, J., Matsumoto, J., Kubo, Y., and Akima, T. New ground improvement technologies under restricted conditions in Japan. The 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, 2015, 1165-1170.
Lavassar, C., Reeves, J., Gerondale, A., Blanding, M., Cowles, B. and Sally, J. Jet grout ground improvement for tunnel launch and retrieval locations on sound transit’s northgate link extension project. Rapid Excavation and Tunneling Conference 2015 proceedings, 718-726.
Njock, P.G.A., Chen, J., Modoni, G., Arulrajah, A. et Kim, Y.H. (2018). A review of jet grouting practice and development. Arabian Journalof Geosciences, 11 : 459(2018).
Recommendations of AFTES (French Tunneling Association) - GT8R2F1 (2006). La conception et la réalisation des travaux d’injection des sols et des roches.
Recommendations de l’AFTES - GT8R1F2 (1975). Travaux d’injection pour les ouvrages souterrains.
Recommendations de l’AFTES - GT24R1F1 (2008). Les reconnaissances à l’avancement.
Recommendations of AFTES (French Tunneling Association) - GT1R1A1 (2003). Characterization of rock mass useful for the design and the construction of underground structures
Các bài báo khác