Solutions to improve the removal efficiency of salt deposition in the production tubing and surface equipment system at Blocks 433&416B, Algeria

  • Cơ quan:

    1 PetroVietnam Exploration Production Corporation, Hanoi, Vietnam
    2 Hanoi University of Mining and Geology, Hanoi, Vietnam

  • *Tác giả liên hệ:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Nhận bài: 03-02-2023
  • Sửa xong: 28-05-2023
  • Chấp nhận: 22-06-2023
  • Ngày đăng: 30-06-2023
Trang: 13 - 23
Lượt xem: 1956
Lượt tải: 18
Yêu thích: 1.0, Số lượt: 2
Bạn yêu thích

Tóm tắt:

The salt deposition and existence in the production system cause the lower size of the flowing system as tubing, fluctuated or unstable production problems, high wellhead pressure, and flowline pressure, plug the choke valve, wellhead, and flowline pipeline. It negatively affects production. Bir Seba Structure (BRS) field production has high salinity content in oil, due to pressure and temperature change through the production system the salt scaling is deposited to be solid salt. Salt deposition during production damages the surface equipment such as the choke valve, clogging the flowline to the central processing facility (CPF). It causes fluctuated problems in flow rate and pressure in the wells, even blocking the tubing and oil couldn’t flow to the surface. Reducing production and undertaking well shut-ins to remove salt deposits and repair equipment are factors contributing to decreased production. Therefore, finding urgent solutions to address salt deposition is crucial. Various methods have been employed to enhance production efficiency, such as the installation of water dilution pumps at the surface, and injecting water and chemicals for salt removal in tubing (e.g., bull heading, coil tubing). The present article focuses on the occurrence of salt deposition issues during production in Bir Seba Field, Blocks 433a & 416b, Algeria. The geological study conducted indicates that the deposition in the Hamra Quazite reservoir originates from a marine environment. The structural cross-section analysis reveals that the sealing salt Trriasis S4 zone acts as the reservoir's sealing zone for the HQ reservoir. Despite a minimal water cut content during production (less than 2%), continuous salt deposition occurs due to changes in reservoir pressure and temperature, high salinity content in oil production, and the presence of small amounts of water vapor from the reservoir. As a result, solid salt particles are transported with the oil to the surface.

Trích dẫn
Khoan Duy Do và Thinh Van Nguyen, 2023. Solutions to improve the removal efficiency of salt deposition in the production tubing and surface equipment system at Blocks 433&416B, Algeria, Tạp chí Khoa học kỹ thuật Mỏ - Địa chất, số 64, kỳ 3, tr. 13-23.
Tài liệu tham khảo

Hai, N.H., Duc, V.M., Hiep, D.Q., Khoan, D.D., Long, N.M., Khai, .N.Q., Cuong, L.M., (2015). Upstream choke valve dilution water injection by Portable Methanol Pumping Package for salt scaling mitigation in BRS Field. Report. Algeria.

Eni Exploration and Production Division, (2015). Salt scaling problems.

Furgo Robertson., (2006). Reservoir Review, Blocks 433a and 416b, Oued Mya Basin, Algeria

GBRS and Groupments in Algeria., (2016). Salt scaling problems and solutions workshop.

GBRS., (2016a). The Pha 2 well-completion design in BRS Field. Algeria

BRS., (2016b). Salt scaling problem of BRS field report. . Algeria.

PIDC., (2007). Field development plan report, Bir Seba Field, Block 433aand416b - Touggourt, Algeria.

PIDC., (2006). Petrophysic Study report - Block 433aand416b - Touggourt, Algeria.

PIDC., (2006). X-Ray special report of BRS-6X, BRS-7X, Algeria.

RIA., (2019). On-site support activities for corrosion assessment to be performed in Algeria, at Groupement Bir Seba (GBRS) field. Algeria.

SGS company., (2015). Salt scaling problems in BRW field. Algeria.

SPER Chemical Corporation. https://www.sperchemical.com/polyphosphate/corrosion-inhibition/.

Các bài báo khác