Research solutions and completion of unloading operations with Nitrogen lifting method in the oil production wells with dual string at Pearl oil field,

  • Affiliations:

    1 Hanoi University of Mining and Geology, Hanoi, Vietnam
    2 Project Block 01&02, PVEP, PVN, Vietnam
    3 Petrovietnam, Camau Fertilizer Joint Stock Company, Camau, Vietnam

  • *Corresponding:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Received: 25th-Mar-2023
  • Revised: 21st-July-2023
  • Accepted: 17th-Aug-2023
  • Online: 31st-Aug-2023
Pages: 49 - 59
Views: 1290
Downloads: 11
Rating: , Total rating: 0
Yours rating

Abstract:

Rehabilitation for multistage production wells is relatively complicated, especially for wells because the design is not really suitable in the well development stage after a long time of prodution. The production wells at the Pearl rig are currently having problems recovering the permeability of the reservoir. For the purpose of increasing the exploitation flow of the well and restoring the output for wells with long service life, the process of calling the product flow after the end of well drilling and well repair campaigns is extremely difficult. Plays a key role in the exploitation of oil and gas wells. However, some current calling methods are not suitable, costly and have low efficiency due to a number of reasons such as technical errors when completing wells, as well as the initial time when investors had different methods. The application method is not suitable, causing the exploitation well to bring low efficiency. Therefore, the research team investigated the production modes and then proposed production recovery scenarios for the wells using liquid nitrogen combined with the existing techniques at the rig that are suitable for the circumstances in Vietnam. Mining rigs have a tight workspace design. In addition, the solution helps to reduce the cost as well as the complexity of the working process at the marine works, bringing both economic and technical efficiency to the restoration of degraded wells. About the catch, without using other stream calling methods.

How to Cite
Le, D.Quang, Pham, T.Van, Nguyen, C.Duc, Le, H.Dac, Nguyen, T.Van and Ngo, N.Tuan 2023. Research solutions and completion of unloading operations with Nitrogen lifting method in the oil production wells with dual string at Pearl oil field, (in Vietnamese). Journal of Mining and Earth Sciences. 64, 4 (Aug, 2023), 49-59. DOI:https://doi.org/10.46326/JMES.2023.64(4).06.
References

Fuladgar, A. M., Moghadasi, J., Ghobadi, H., and Haghi, A. H. (2014, February). Optimization of Unloading Operation with Coiled Tubing (Nitrogen Lifting) in One of the Southern Iranian Oil Fields. In a paper presented at the 8th International Chemical Engineering Congress and Exhibition (IChEC 2014) Kish, Iran (pp. 24-27).

Lê, P. H., (2006). Công nghệ khai thác dầu khí. Nhà xuất bản Đại học Quốc gia, TP.HCM.

Lê, Q. D., Vũ, V. T., Tăng, V. Đ. (2019). Giải pháp công nghệ nâng cao hiệu quả hệ thống tách nước tại giàn công nghệ Trung tâm CPP - 3 Mỏ Bạch Hổ. Tạp chí Khoa học Kỹ thuật Mỏ - Địa chất 60(1). 19 - 25.

Lê, X. L., Ngô H. H., Nguyễn H. A., Nguyễn T. V., Lê H. H., (2017). Công nghệ mỏ dầu khí. Nhà xuất bản khoa học kỹ thuật.

Mullakaev, M. S., Abramov, V. O., and Abramova, A. V. (2015). Development of ultrasonic equipment and technology for well stimulation and enhanced oil recovery. Journal of petroleum science and engineering, 125, 201-208.

Junlei, W. A. N. G., Ailin, J. I. A., Yunsheng, W. E. I., Chengye, J. I. A., Yadong, Q. I., He, Y. U. A. N., and Yiqiu, J. I. N. (2019). Optimization workflow for stimulation-well spacing design in a multiwell pad. Petroleum Exploration and Development, 46(5), 1039-1050.

Economides, M. J., Hill, A. D., Ehlig-Economides, C., and Zhu, D. (2013). Petroleum production systems. Pearson education.

Petroliam Nasional Berhad, (2012). Drilling and well operations. Permata-Instep, Petronas 2010, Production Optimization, artificial.

Petronas, (2012). PECAS training program for production. Technical non Excutive (net).

Petronas, (2010). Engineering, procurement, construction, insllation, hook-up and commissioning of Pearl platform.

Phùng Đ. T., Danh L., Lê B. T., Nguyễn V. C., (1999). Công nghệ và kỹ thuật khai thác dầu khí, Nhà xuất bản Giáo dục, Hà Nội.

Other articles