Determining the ability to receive rock of waste dumps when exploiting a group of open-pit coal mines

  • Affiliations:

    1 Department of Surface Mining, Mining Faculty, Hanoi University of Mining and Geology, Vietnam
    2 Faculty of Mining, Saint Petersburg Mining University, Russia

  • *Corresponding:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Received: 8th-Sept-2020
  • Revised: 29th-Sept-2020
  • Accepted: 10th-Oct-2020
  • Online: 15th-Oct-2020
Pages: 71 - 79
Views: 2410
Downloads: 843
Rating: 1.0, Total rating: 84
Yours rating

Abstract:

In the process of developing the general exploitation and disposal plan for the Deonai, CocSau and Caoson coal mines, use should be taken into account the maximum internal disposal sites to reduce the transport supply and facilitate the environmental restoration work after exploitation. However, in the geological conditions of these coal mines, in order to ensure the space to exploit and make full use of useful minerals, it is necessary to calculate the economic efficiency when building the exploitation and disposal plan. The content of the article is based on the criteria of optimum transportation flows of rock in the arrangement of waste disposal when exploiting a group of three open-pit mines Deo Nai, Coc Sau and Cao Son.

How to Cite
Do, H.Ngoc and Igorevic, F.Sergey 2020. Determining the ability to receive rock of waste dumps when exploiting a group of open-pit coal mines (in Vietnamese). Journal of Mining and Earth Sciences. 61, 5 (Oct, 2020), 71-79. DOI:https://doi.org/10.46326/JMES.KTLT2020.06.
References

Do Ngoc Hoan, Sergey Igorevich Fomin, Vladimir Viktorocich Ivanov, (2018). Rational combination of capital mining and Construction mining Operations in coal cuts. International Journal of Engineering & Technology 7(4.38), tr. 1118-1121.

Đỗ Ngọc Hoàn, Nguyễn Thị Oanh, Lê Khắc Bộ, (2009). Nghiên cứu hoàn thiện các phương pháp đổ thải hợp lý cho các mỏ lộ thiên lớn vùng Cẩm Phả Quảng Ninh. Tuyển tập Báo cáo nghiên cứu khoa học sinh viên năm 2009, Trường Đại học Mỏ - Địa chất, Hà Nội, tr. 41-44.

Hill J.H., (1993). Geological and economical estimate of mining projects, London: Informa Group, 85 trang.

Hồ Sĩ Giao, Bùi Xuân Nam, Nguyễn Anh Tuấn, (2009). Khai thác khoáng sản rắn bằng phương pháp lộ thiên. NXB Khoa học và kỹ thuật, Hà Nội, 540 trang.

J. White and J. Olson, (1992). “On improving truck/shovel productivity in open pit mines.” Proceedings of the 23rd International Symposium on Application of Computers and Operations Research in the Minerals Industries (APCOM ’92), tr. 739-746, SME, Littleton, Colo, USA, 1992.

Lalit Kumar Sahoo, Santanu Bandyopadhyay, Rangan Banerjee, (2014). Benchmarking energy consumption for dump trucks in mines. Applied Energy, 113, tr. 1382-1396.

W. Hustrulid, M. Kuchta, (1998). Open Pit Mine: Planning & Design, Brookfield VT: A.A. Balkema, 735 trang.

В.Л. Яковлев, С.В. Корнилков, (2009). Методические подходы к учету закономерностей и региональных особенностей при выборе стратегии освоения месторождений полезных ископаемых. Екатеринбург, Геотехнологические проблемы комплексного освоения недр, 5, tr. 163-171.

В.С. Хохряков, Г.Г. Саканцев и др., (1999). Экономико-математическое моделирование и проектирование карьеров. Кузбассвузиздат, Кемерово, - 140 trang.

С.И. Фомин, Г.А. Холодняков, (2013). Метод определения производительности совместной разработки месторождений на предварительной стадии оценки целесообразности разработки. В кн.: Сборник научных трудов СПГГИ, 2. С-Пб., изд. СПГГИ, tr. 26-35.

С.И. Фомин, Г.А. Холодняков, М.В. Баженов, (1995). Обоснование целесообразности разработки месторождений группы карьеров. г. Рудный, Рудненская гор. тип., 115 trang.

С.И.Фомин, Д.А. Ведрова, Ван Тхань Доан, (2013). Организация открытой разработки месторождений группой карьеров. Журнал «Маркшейдерия и недропользование», 3, tr. 44-49.

Шешко, Е.Е., (2003). Горнотранспортные машины и оборудование для открытых работ. МГУ, М., 186 trang.